Lisa Leatham, Principal
Translate

I wanted to share with you the latest photos of our school under construction this summer. All of the construction workers have been doing a great job. Walls have been torn down in the office area, the storage room has been removed to make space for the new cafeteria, and they are digging outside of Room 3 in preparation for the new building.  I was able to put on a hard hat this afternoon and see the progress for myself. Read on to see photos of what lies behind the fence…..

Thank you to LCG Pence for protecting our library mural during construction.

Thank you to LCG Pence for protecting our library mural during construction.

 

The view across the library to the office and staff lounge. Can't wait to see the new library take shape.

The view across the library to the office and staff lounge. Can’t wait to see the new library take shape.

Hard to visualize where the office used to be....

Hard to visualize where the office used to be….

 

Future site of our new cafeteria- notice the old storage room is gone.

Future site of our new cafeteria- notice the old storage room is gone.

Leveling ground in preparation for the new classroom wing.

Leveling ground in preparation for the new classroom wing.

 

 

Stay tuned for updates!

 


 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Contact Veneta

Phone: (541) 935-8225

88131 Territorial Road
Veneta Oregon 97487

Post Categories
Subscribe!